Design-build shortens the path from idea to occupancy and keeps design and construction pulling in the same direction.
What you get
- A single contract and a single point of accountability
- Cost feedback while the design is still being drawn
- Early procurement of long-lead items to protect the schedule
- A team that has built the building type before
Good fit for
Owners with a firm opening date, a fixed budget or a facility type that rewards early builder input, such as clinics, civic buildings and industrial space.